HONEYWELL霍尼韦尔执行器M7285执行器M7285A1003 产品资料: check the operation using the same method as for overvoltage. Example: For monitoring mode set to three-phase three-wire monitoring, a rated voltage of 200 V, and an operating time of 5 s. Note: K8AB-PM@ output relays are normally operative. Connection Diagram 1 How to Measure the Operating Time Overvoltage Change the input suddenly from 0% to 120% of the set value and measure the time until the Unit operates. Undervoltage Change the input suddenly from 120% to 0% of the set value and measure the time until the Unit operates. Operating Time Adjust the slide resistor so that the voltage applied to the K8AB terminals is 120% of the set value (for overvoltage detection) and 80% of the set value (for undervoltage detection) when the auxiliary relay operates, as shown in connection diagram 2. Close the switch and use the cycle counter to measure the operating time. Connection Diagram 2 Checking the Phase Sequence and Phase Loss Operation Phase Sequence Switch the wiring, as shown by the dotted lines in connection diagram 1, to reverse the phase sequence and check that the K8AB operates. Phase loss Create a phase loss for any input phase and check that the K8AB operates. Operating Adjustment Knobs Use a screwdriver to turn the knobs. There is a stopper to prevent the knob from turning any further once it has been turned completely to the left or right. Do not force the knob past these limits. Load-side Phase Loss In principle, phase loss cannot be detected on the load side because the K8AB-PM@ measures three-phase voltage to determine phase loss. Motor Load Phase Loss during Operation Motor load phase loss cannot be detected during operation. It can be used to detect phase loss at startup. Normally, three-phase motors will continue to rotate even if